As areas were finished lighting was installed. |
Perimeter lighting is added downstairs and the washer and dryer were delivered at the end of December. |
We finished the cedar above the shower and the plumbers were then able to finish their work in the bathroom. |
Basement stairwell railing. |
And here the builder was finally able to return and start the upper railing. |
I do love how these railings turned out. Gosh! It is fun going through these pictures and seeing again how things came together. |